- Alley Access
- Shared Cost Sidewalk Program
- Driveways
- Links & Files
- Menu Infrastructure Fund
- Vacant & Abandoned Properties
- Zoning
- Infrastructure Projects
- Damen / Elston / Fullerton Intersection Project
- Halsted Bridge Reconstruction
- Installation of a New Tumbling Basin
- Kenmore Ave. and Belden Ave. Water Project
- Kingsbury Reconstruction
- Lincoln Ashland Belmont Intersection Improvement
- Lister Avenue Reconstruction
- METRA-UP North Line Bridge Reconstruction Update
- New Water & Sewer Main Installation- N. Hoyne (W. Walton- W. Cortez)
- New Water Main Installation N. Leavitt/ W. School/ N. Hamilton/ W. Roscoe
- New Water Main Installation- N. Bosworth (W. Wrightwood – W. Diversey)
- New Water Main Installation- N. Rockwell ( W. Logan- W. Fullerton)
- New Water Main Installation- N. Surrey (W. Fullerton- W. Altgeld); W. Montana (Racine to Surrey)
- New Water Main Installation- N. Western ( W. Diversey- W. Roscoe)
- New Water Main Installation- W. Diversey (N. Racine- N. Sheffield)
- New Water Main Installation- W. Oakdale/ W. George/ W. Wolfram (N. Honore- N. Damen)
- New Water Main Project- N. Oakley from W. Addison to W. Cornelia
- Sewer Installation on N. Oakley from W. Fullerton to W. Belden
- Sewer Installation on Seminary (Lill to Lincoln)
- Water Main Installation – Bloomingdale Ave. (Damen Ave.- Wood St.)
- Water Main Installation – N. Southport (Fullerton to Webster)
- Water Main Installation on W. Nelson St. from Ravenswood to Ashland
- Water Main Installation W. George Street, from N. Lakewood Avenue to N. Halsted Street
- Water Main Installation Western Avenue Project
- Water Main Installation- N. Leavitt (W. Addison- W. Belmont)/ W. School (N. Leavitt- N. Hoyne)/ N. Hamilton (W. Addison-W. School)/ W. Roscoe (N. Hamilton-N. Leavitt)
- Water Main Installation- W. Altgeld from W. Wrightwood- N. Marshfield
- Water Main Installation- W. Barry ( N. Southport- N. Kenmore)
- Water Main Installation- W. Fletcher (Ravenswood to Paulina)
- Water Main Installation- W. Oakdale ( N. Lakewood- N. Seminary)
- Western Avenue Corridor Improvement Project
- Kingsbury & Lakewood Railroad Spurs
Halsted Bridge Reconstruction
The Chicago Department of Transportation (CDOT) is reconstructing the Halsted Street bridge over the Chicago River North Branch canal. The new bridge will replace the existing movable bridge, built in 1909. The bridge hasn’t operated in more than 25 years,and a movable bridge is no longer needed.
The new, tied-arch bridge will feature two full lanes of traffic in each direction, up from the current one lane in each direction. The bridge will also feature marked bike lanes in each direction. This new configuration will improve traffic flow and safety for motoristsand bicyclists.
Other project features:
- Resurfacing of Halsted from Division to North Branch
- Architectural lighting
- Streetlight replacement
TRAFFIC DETOURS
- Cars and bikes–Chicago to Larrabee to Division, back to Halsted
- Trucks and buses–North Branch to Cherry to Division, back to Halsted
BUS STOP RELOCATION
Halsted at Division
Southbound, Farside to Nearside
Stop ID Number: #15273 (farside ID)
Routes Stopping: #8 – Halsted
Halsted at North Branch (NB, FT) to North Branch at Halsted, (NWB, FS)
Northbound, Far-T to North Branch at Halsted, Farside
Stop ID Number: #15405 (Far-T ID) to #16022 (Farside ID)
Routes Stopping: #8 – Halsted