Restoration (Concrete Cap) will begin the week of 8/1/22 from Diversey to Logan.
No parking signs:
From Diversey to Logan on each side of the street
Lane closure and traffic control:
Southbound lanes closed during construction. Open lane each direction available on the existing NB lanes during construction (Diversey to Logan)
Comments